2t Rack and Pinion Construction Elevator

2t Rack and Pinion Construction Elevator

SC200/two hundred Two-motor Generate 40m/min CZPT CZPT 

  
 

SC200/two hundred -40m/min Frenquency Conversion CZPT Efficiency Parameter Record
No. Item Device Parameter Note
1 Reted Load kg two x 2000 CZPT cage
two Install/disassemble Reted load kg two x a thousand CZPT cage
3 Lifting Pace m/min -40 Reducer Ratio 1:sixteen
four Max. Peak m 200  
5 Cage Dimension(LXW) m x m 3×1.five/three.2×1.five  
six Distance Among Basis And Cage Base m .forty six  
7 Length between Anchor m ≤9  
8 Totally free Finish Top m ≤9  
9 Electricity Supply V 380V±5%  
ten Motor Energy kw 2x2x13 JC=twenty five%
eleven Inverter Electricity kw 37  
12 Rated Recent A 2x2x28  
thirteen Security Unit Design   SAJ40-one.2A  

ZheJiang CZPT CZPT CZPT Co., Ltd was launched in Dec. 2000, specialised in manufacturing tower cranes and development elevators, we are pioneer of Chinese tower crane industry.

At existing our items protect nine collection and more than 20 designs, such as QTZ50, QTZ63, QTZ80, QTZ125, QTZ160, QTZ250, QTZ315, QTZ500, SC200/200, the technological indicators have arrived at the foremost level at house and abroad.

High top quality
Uncooked content is the foundation of solution and the initial hurdle to ensure good quality. CZPT tower crane bulk obtain steel straight from massive steel factories like Baosteel and Wisco, increase the protection of item.

                                
Initial course factors
Very first-course solution composed by initial-class components, CZPT constantly insisted to use the 1st class parts, as Fangyuan assistance, Schneider electrical element and so on.

Innovative processing gear
We have the most innovative processing products, these kinds of as the large laser cutting equipment,CNC plasma cutters, CNC drilling machines, lathes, milling equipment, sawing machines and other folks. 

Robotic automatic welding program and publish-weld total processing products

We are the 1st organization to adopt mast sections and principal chord robot welding program in the identical market in China. This program is reputable in the efficiency, with large operate efficiency and higher automated degree. The welding quality a lot more dependable and durable.

The main limbs of the mast section, the turntable and other parts are all processed and drilled following welding to boost the accuracy.

Computerized impeller blasting and spraying assembly line
The massive framework areas are dealt with impeller blasting before spraying. That eliminate metal surface oxides and welding spatters successfully, gets rid of the inner tension generating in welding approach, increases the parts’ anti-figure strength and steel surface hardness, boosts painting adhesion and lengthen the support daily life of the solution maximizes effectiveness and saves energy

Rigorous top quality assessment
CZPT have the rigorous quality test, uncooked content examination, examination of welding, checking welding quality of look, assembly and adjustment of jib, tower head and pivot in factory.

Safety protection
Completely safety security units increases the security, excess weight limiters, adopt the superior pull-ring structure from abroad, second adopt bow-board mechanical variety which can be utilized in significant wild surroundings.

We have professional packing particular person to place the tower crane in the container or on to the truck.

 

FAQ

Q1: How several nations around the world have you exported your merchandise to?
A1:Our tower cranes experienced exported to far more than twenty countries, these kinds of as Korea, Vietnam, Philippines, Indonesia, India, Sri Lanka, Cambodia, Russia, Kazakhstan, Brazil, Algeria, Ukraine, Turkey etc.

Q2: How to validate a ideal design hoist product?
A2: My dear pals, please inform us the underneath simple parameters to confirm hoist design:
a. Developing top.
b. Max load potential .
c. Other Particular specifications

Q3: Can you put in the  hoist for us 
A3: Yes, we can send one engineer to your place for putting in, but you need to bear the expense. 

Q4: Warranty time?
A4: 12 thirty day period from the transport working day (apart from the wearing components).

Any other inquiries, you should give us a information, hope can cooperate with you! and welcome to go to us!

2t Rack and Pinion Construction Elevator

Tags